Application of the booking system delay time study work sampling and group incentive policy in a watch factory

Deep Chandra

Application of the booking system delay time study work sampling and group incentive policy in a watch factory - 1990 - 84p. 28cm. Index Term-Uncontrolled

621.072 / DEE

Powered by Koha