Simulation study of multiproduct scheduling in flowshop and jobshop systems.

By: Mishra, Ramesh Chandra | University of RoorkeeContributor(s): Gaindhar, J.L. GuideMaterial type: TextTextPublication details: Roorkee MID 1986Description: xvii,179 Index Term-Uncontrolled Multiproduct Scheduling; Jobshob SystemsDDC classification: 621.072
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Thesis Thesis Mahatma Gandhi Central Library
621.072 MIS (Browse shelf(Opens below)) 1 Available 245438

There are no comments on this title.

to post a comment.

Powered by Koha