Your search returned 5 results.

Sort
Results
Optimum maintenance policy for equipment subject to breakdown

by S.K.V.Prasad, N | IIT Roorkee | Dinesh Kumar Gu.

Material type: Text Text Publication details: Roorkee MID 2003Availability: Items available for loan: 1 Call number: 621.072 S.K.V..

Scheduling of projects with resources restrictions

by Rao, B.V. Nageswara | University of Roorkee, Roorkee, Mechanical Engineering | Dinesh Kumar Gu.

Material type: Text Text Publication details: 1999Availability: Items available for loan: 1 Call number: 621.072 RAO.

Modelling of a transfer line and its behavioural analysis

by Katiyar, Krishan Kumar | University of Roorkee, Roorkee, Mechanical Engineering | Dinesh Kumar Gu.

Material type: Text Text Publication details: 2001Availability: Items available for loan: 1 Call number: 621.072 KAT.

Knowledge base system for the automation and optimisation of machining process

by Maurya, Anil Kumar | University of Roorkee, Roorkee, Mechanical Engineering | Dinesh Kumar Gu.

Material type: Text Text Publication details: 2001Availability: Items available for loan: 1 Call number: 621.072 MAU.

Modelling and simulation of inventory system in army workshops

by Vishwa Mohan Kumar | Indian Institute of technology Roorkee, Roorkee, Mechanical Engineering | Dinesh Kumar Gu.

Material type: Text Text Publication details: 2003Availability: Items available for loan: 1 Call number: 621.072 VIS.

Pages

Powered by Koha